Immediately after its establishment, AdA Energy has worked on the determination of suitable location, flow measurement and preparation of Feasibility Reports for river and canal type HEPPs.
In this context, nearly 30 preliminary reports and Feasibility reports have been prepared for many companies, many of which have been implemented by the project owner company, and electrical energy production has begun in these facilities.
The absence of a long-term flow observation station on the river where the River and Canal Power Plants will be established has necessitated the establishment of a flow observation station to measure these flows in some projects.
AdA Engineering has established Flow Observation Stations on the rivers where all the HEPP projects it has done feasibility report study, and has taken measurements reaching 5 years from these and used them in its studies.